This request for proposal is being administered by the Town of Waterville Valley, New Hampshire. This notice applies to firms that meet the qualifications outlined below for performing value Engineering services related to the design and construction of a new wastewater treatment facility (WWTF) for the Town of Waterville Valley. The new WWTF will be situated on a site adjacent to the Town’s existing WWTF. The existing plant was constructed in 1974, and it has been determined that the facility has reached the end of its useful life. Based on both age and condition of the existing WWTF along with the more stringent effluent permit limits stipulated by the new NPDES effluent permit issued to the Town in 2022, it has been determined that the existing plant cannot be reused and rehabilitated and the Town has decided to decommission and demolish once the new WWTF is fully constructed and commissioned.
To be considered qualified for this work, the Town of Waterville Valley, New Hampshire is seeking a value engineering firm with a minimum of ten (10) years of experience performing Value Engineering work on WWTF projects with commensurate experience in design and construction related services of WWTFs, along with demonstrated capability to understand construction costs and schedules. The proposing firms must focus on demonstrating their prior work experience and abilities to address the specific items above. The Town is seeking to confirm that the highlighted projects described by the firm in their Qualifications Statement along with references are tied to professionals and technical staff the firm is proposing for this VE assignment. The Town is on a fast-track schedule to undertake this project and requests that the VE work be fully accomplished in four consecutive days and with a preliminary report submitted to the Town no later than one week following the completion of the VE work. The Town requests the VE firm’s team to be comprised of senior engineers, technical staff and a cost estimator each with a minimum of 10 years direct and relevant experience to this Town project. The VE team must comprise a) VE Team manager b) a Civil/Mechanical Process Engineer c) a structural engineer d) an HVAC engineer and e) a Construction Cost Estimator.
To view the full RFP, please visit the link below.
https://www.watervillevalleynh.gov/home/news/request-proposal-new-wastewater-treatment-facility